Skip to main content

Work out an overtime amount by hand

Every overtime amount is three numbers multiplied out and rounded: the hours credited, the hourly rate, and the rounding. This page gives the arithmetic for each one, so a payroll officer can check any line on the Employee Overtime with a calculator.

Screen
Employee Overtime, Pay Rate, Overtime Policy Setup
Who
The payroll officer or the implementation consultant
Needs first
The employee's salary, the pay rate on his profile's overtime line, and the overtime policy

1. The hours credited​

When hours come from attendance, the extra minutes of each day go through the bands of the Overtime Policy Setup for that weekday:

  1. Round the extra time to the whole minute.
  2. Find the highest band whose Range From is at or below those minutes.
  3. That band's Overtime is what is credited. Past the last band, the last band's figure is credited, so the last band is the daily cap.

Example bands for a weekday:

Range FromRange ToOvertime
0290
305930
608960
9011990
120240120
Extra time workedCredited
25 minutes0
1 hour 47 minutes, so 107 minutes90 minutes, 1.5 hours
5 hours120 minutes, 2 hours

Hours typed as entered, and approved requests, skip the bands. A request's hours are multiplied by its Rate Multiplier instead.

2. The hourly rate​

The rate comes from the Pay Rate on the employee's overtime line.

A fixed rate. If the pay rate is ticked Constant Valuation, the hourly rate is the Rate Per Hour on the Constant Rate line in force on the last day of the pay period. Skip to step 3.

A multiple of salary. Each Condition line of the pay rate names a wage type. Every line whose wage type is in the employee's salary adds to the rate. The salary used is the one in force on the last day of the pay period. For each line:

Calculate Based OnHourly amount from one line
Fixed Daysmonthly amount × Value % ÷ 100 × 12 ÷ Calculation days ÷ Calculation hours
Calendar Days of the Pay Periodmonthly amount × Value % ÷ 100 ÷ days in the pay period ÷ Calculation hours
Working Days of the Pay Periodmonthly amount × Value % ÷ 100 ÷ working days of the pay period on his calendar ÷ Calculation hours

Add the lines up, then round to the policy's Per Hours Rounding Precision.

Value % is the overtime multiple. 150 means time and a half, 200 means double. There is no separate multiplier anywhere else for hours from attendance.

Example: time and a half on a 26-day month​

  • Basic 40,000 and house rent 12,000 a month, both on the pay rate.
  • Value % 150, Calculation days 312, Calculation hours 8, Calculate Based On Fixed Days.
LineWorkingPer hour
Basic40,000 × 150 ÷ 100 × 12 ÷ 312 ÷ 8288.46
House rent12,000 × 150 ÷ 100 × 12 ÷ 312 ÷ 886.54
Rate375.00

The rounding is applied to the total, not per line, so it can differ by a fraction from the sum of rounded lines.

Example: calendar days​

The same 52,000 with Calculate Based On set to Calendar Days of the Pay Period:

  • In a 30-day month: 52,000 × 1.5 ÷ 30 ÷ 8 = 325.00 an hour.
  • In a 31-day month: 52,000 × 1.5 ÷ 31 ÷ 8 = 314.52 an hour.

On Working Days of the Pay Period, in a month with 26 working days: 52,000 × 1.5 ÷ 26 ÷ 8 = 375.00 an hour.

3. The amount and its rounding​

Round Amount Per DayAmount
Cleartotal hours × hourly rate
Tickedeach day's hours × hourly rate, rounded to Amount Rounding Precision, then added up

Finally, if Round Total Amount To is more than 0, the total is rounded to a multiple of it, by the Total Amount Rounding Method: up, down or nearest.

Example​

Ten credited hours at 375.00 = 3,750.00. With Round Total Amount To 50 and the method Round Up, it stays 3,750. With 10.5 hours it is 3,937.50, which rounds up to 3,950.

Check it worked​

  • Your hourly rate matches the rate on the Employee Overtime line.
  • Your amount matches its amount.

If it goes wrong​

  • The rate is double what you worked out. Two lines on the profile share one category, so their pay rates are added. Give each line its own category.
  • The rate is lower than expected. A wage type of the salary is missing from the pay rate, or its Value % is less than the multiple.
  • The rate uses last month's salary, or next month's. The salary in force on the last day of the period is used for the whole period.
  • A day costs a different amount every month. Calculate Based On is Calendar Days or Working Days of the Pay Period.
  • The amount is zero. The pay rate line has no Calculation hours, or a fixed rate has no Constant Rate line on the period's last day.