Fix a missed or wrong punch
There are two ways to put a day right. The employee raises an Employee Attendance Request with the true times and his manager approves it; the approval writes the corrected day. Or HR opens Employee Attendance and types the times in. Either way the reader's own punches stay visible next to the correction.
Before you start
- A working day with only one punch reads Absent and is flagged as a discrepancy. Adding the missing time puts it right.
- How far back a request may go is the Attendance Correction Backdate Limit (Days) on the Policy tab of the person's Calendar. 0 means no limit.
- A day already inside a saved Payroll Attendance sheet cannot be corrected by either route. See Correct attendance after payroll attendance is made.
- A day not worked at all is not a punch problem. Use leave, Record a day worked away from the office or Excuse a late arrival or absence.
Steps
By request and approval (recommended)
- The employee opens Employee Attendance Request, picks himself, and enters Date From and Date To.
- He creates the document. One line comes back per day, with the schedule and the current status.
- He ticks Action on each day being corrected and enters the true Date In, Attendance Time In, Date Out and Attendance Time Out. Both dates go together, and both times go together.
- On a night shift that ends after midnight, Date Out is the next date.
- He writes the reason in Notes and saves. The request goes to his manager.
- Once it is approved, an Employee Attendance document is made from it and the day is worked out again.
Directly by HR
- Open Employee Attendance. Enter the dates and narrow by site or department. Set Present to the absent status to pull only the days that need explaining.
- Type the true times over Date In, Attendance Time In, Date Out and Attendance Time Out. Leave the Actual columns alone.
- Write who confirmed it in Line Text.
- Save. Only the lines you changed are written, and the status is worked out again.
Check it worked
- The day on Employee Attendance shows the corrected times and a working status, and Total Hours is sensible.
- The Actual columns still show what the reader got.
- On the request, the Employee Attendance document it produced can be found from the request number.
If it goes wrong
- "Date From cannot be more than 7 day(s) in the past". The day is older than the calendar's backdate limit. The limit is set on the calendar's Policy tab.
- "Attendance Request no already exists for these dates". Another request covers the same day and is waiting or approved. Change that one. A rejected or deleted request does not block.
- "Please select at least one line." Tick Action on the day being corrected.
- "Date From cannot be later than Date To" or "Date In cannot be later than Date Out". Swap the dates.
- Both dates or both times must be filled. A line with Date In and no Date Out, or Time In and no Time Out, is refused. Fill both, or neither.
- The lines overlap. Two ticked lines cover the same hours. Correct one.
- "You cannot create a request for this employee because they are Already Processed in Payroll Attendance." The day is in a payroll attendance sheet.
- "Date In must be the same as Schedule Date In". On Employee Attendance, the counted arrival must be on the day of the shift. Put a wrong-day arrival right through Date Out, not Date In.
- Total Hours is negative. Date Out is the same date on a night shift. Use the next date.
- The request cannot be deleted. An Employee Attendance document was already made from it.
- There is nobody to approve it. The person's reporting line is not set.