Rotate crews on a shift roster
A rotation is built once as a Shift Pattern: how many days the cycle lasts and which shift, or which off day, each day of it is. Each crew then gets a Shift Roster on that pattern, with its own Cycle Start Date. Three crews rotating against each other are one pattern and three rosters.
Before you start
- Write the cycle out in words, including the off days: "four days morning, two days off, repeating". Count the days. That is the Cycle Length. Four on, two off is 6.
- The Day column on the pattern is the position in the cycle, counted from 0. It is not a weekday. A weekly pattern is 7 days long, and Day 0 becomes whatever weekday the roster's Cycle Start Date falls on.
- Know which date each crew starts its cycle. Crews two days apart get Cycle Start Dates two days apart.
Steps
- Open Shift Pattern. Enter a code, a description and Cycle Length (Days), for example
ROT-6,4 on 2 off,6. - Add one Details line per day of the cycle. Day
0to3with the morning Time Template. Day4and5with Off Day ticked and no template. - For a cycle that moves from mornings to evenings to nights, give each day the template of that week's shift. A 21-day cycle of seven mornings, seven evenings and seven nights is 21 lines.
- Fill Required Headcount only if the client plans each day by numbers.
- Save.
- Open Shift Roster. Pick the pattern. Enter Date From, leave Date To empty for a permanent crew, and enter the Cycle Start Date: the date Day 0 falls on for this crew.
- Add one line per person in the crew. One line each, once; the dates come from the pattern.
- Open the Plan tab before saving. It draws four weeks of this crew and of every other roster on the same pattern.
- Save. Repeat for the next crew on the same pattern, with its Cycle Start Date moved on.
- Check the Plan tab on any of the crews. Every day should be covered, and no two crews should sit on the same shift unless intended.
Check it worked
- The Plan tab shows each crew's shift, or off, for each day.
- On Employee Attendance, the person's Schedule Time In and Time Out follow the rotation, and an off day of the cycle reads Weekend.
If it goes wrong
- "Cycle Length must be at least 1 day". Enter the number of days in the cycle.
- "A shift pattern needs at least one day". Add the Details lines.
- "Day must be between 0 and 5". Days count from 0, so a 6-day cycle runs 0 to 5.
- "An off day cannot also carry a time template". Clear the template on the line ticked Off Day.
- "Enter a time template or mark the day off". Every line needs one or the other.
- "Day 2 segment 1 is entered more than once". Two lines have the same Day and Segment. Delete one, or see Let anyone work whichever shift they come on if you meant several shifts on one day.
- "Date To cannot be earlier than Date From". Swap the dates, or clear Date To.
- The whole crew is one day out. The Cycle Start Date is wrong. Change it on the roster, never on the pattern.
- The rotation must change from next month. Build a new pattern and a new roster from that date, and put a Date To on the old roster. Editing the pattern changes past days too.
- A day on the Plan tab is outlined in red. The pattern asks for more people that day than the roster has. It blocks nothing.